high temperature silicone sealant.
11. Install a T with cleanout and appropriate length of vertical venting with supports. A listed vertical vent cap is
recommended however (if local codes allow) when the vent terminates several feet above ground level and there are no
trees, plants, etc. within several feet, a 90° and 45° elbow can be used as a termination. The 45° elbow must be turned
down to prevent rain from entering
and also have a screen with ¼” holes.
Freestanding Interior Vertical Installation (See following figure)
NOTE! Venting joints may not be located in an attic, roof space, closet or similar concealed space, or floor or
ceiling.
1. Choose the location for your pellet stove, see item 1 of the Horizontal Exhaust Vent Installation (previous page) for
help in determining the correct location.
2. Note:
The stove cannot be used without foot screws installed for maintaining a 1” gap from the floor to the bottom of
the stove base. This is required to keep temperatures cool enough underneath the unit.
3. Install the non-combustible hearth pad in a location so when the stove is placed it will leave the exhaust vent with a
minimum of 3” (75 mm) clearance to any combustible wall.
4. For installing the air intake, locate the center of the combustion air intake pipe at the back of your unit. Line up the
center with the same spot on your exterior wall and cut the appropriate sized hole through the wall for pipe size being
used.
5. Secure all vent joint connections with 3 screws. Seal the exhaust vent joint connections with high temperature
silicone sealant.
6. Install the combustion air intake pipe.
7. Install a tee with a cleanout on the exhaust pipe found at the rear of your unit.
8. Install vent (use listed type only) upward through the ceiling. When you pass through the combustible framing ensure
that the appropriate ceiling firestop
is used. You must maintain a minimum 3” (75 mm) clearance to combustibles and
keep any insulation away from the exhaust vent.
9. Extend the exhaust vent through the roof flashing and ensure that the vertical cap is at least
36” (900 mm) above the
roof.