
Creating a Backup Image
Note
When you launch Acronis True Image OEM for the first time, the software prompts you to upgrade to the full version to
enable features such as network backups and incremental backups. These features are optional and not supported by NI.
1.
Select
Start»All Programs»Acronis»Acronis True Image OEM
to launch the Acronis True Image OEM application.
2.
Click
Yes
when prompted to allow Acronis True Image OEM to make changes to your device.
3.
Select
BACKUP
from the left-hand menu to display the backup options pane.
If Acronis True Image OEM does not automatically create a new backup, click
Add Backup
.
4.
Click the drop-down arrow next to the new backup to rename the backup.
5.
Click
Select source
.
6.
Select
Entire PC
.
7.
Click
Select a destination
to select where the backup image utility is saved.
8.
Click
Back up now
to save the new backup utility image.
Restoring to the Factory Image
1.
Restart the PXI controller.
2.
Press <F4> when prompted to interrupt start up and launch Acronis True Image OEM.
3.
Select
Recover
to reimage the ECUTS.
Powering On After Thermal Shutdown
The ECUTS has two safety shutoff thermostats on the interior of the test rack. Thermostats are located near the hot air exhaust vent in the front
and back of the test rack. When triggered by a thermal event, the thermostats shut down the ECUTS by cutting power to the power entry AC
outlet(s). To reset the thermostats after they have tripped, complete the following steps:
Caution
Allow the ECUTS surface to cool to 65 °C before performing any maintenance or service procedures.
Attention
Attendez que la température de surface de l'ECUTS descende sous 65 °C avant d'effectuer toute procédure de
maintenance ou de réparation.
1.
Disconnect MAINs power from the PEP.
2.
Open the rear cabinet door.
3.
Press the red button on the bottom of each thermostat.
Note
Thermostats must cool to 65 °C before resetting.
4.
Restart the ECUTS using the
procedure.
5.
Close and lock the rear cabinet door.
Maintenance
Cleaning the Test Rack Exterior
Clean ECUTS exterior surfaces with a dry lint-free cloth or a soft-bristle brush. If any dirt remains, wipe with a cloth moistened in a mild soap
solution. Remove any soap residue by wiping with a cloth moistened with clear water. Do not use abrasive compounds on any part of the test
rack.
Notice
Use the following guidelines to avoid damaging the ECUTS when cleaning the test rack exterior:
•
Avoid getting moisture inside the system during exterior cleaning. Use only enough moisture to dampen the cloth.
•
Do not wash the front- or rear-panel connectors or switches. Cover these components when cleaning the test rack.
•
Do not use harsh chemical cleaning agents; they may damage the ECUTS. Avoid chemicals that contain benzene, toluene, xylene, acetone,
or similar solvents.
Cleaning the Air Intake Filter
NI recommends cleaning the air intake filter once per month or as needed. Use NI part number 785791-01 to order replacement air intake
filters.
Complete the following steps to clean the air intake filter:
1.
Remove the four screws securing the 4U air inlet panel to the test rack.
2.
Remove the filter media from the inlet panel.
3.
Clean the air intake filter using warm water with a mild soap solution, then air dry the filter to remove moisture.
4.
After verifying that the filter is dry, replace the filter in the test rack with the white side facing outwards.
5.
Replace the 4U air inlet panel.
50
|
ni.com
|
ECUTS-16000/16001 User Manual