37
Gear box - knifes blade
’
s joint and bearing reel lubricate
Maintenance Interval:
08 working hours / 01 working days.
How to:
Inject the grease where indicated on picture.
2
1
Control and eventual refill of gear box Oil level
Maintenance Interval:
1st after 02working days; than control it each 14working days.
How to do it:
Open Bolt (1) and control oil level. Eventually refill from the top
(2) with OIL SAE 90 - ISO 220.
1
Cardan joint transmission chain (left side)
Maintenance Interval:
1st after 02working days, than each 14working days.
How to:
To change tensioning work on (1).
07.03 Ordinary maintenance
UK
Содержание SUNSTORM SFH600
Страница 5: ...7...
Страница 18: ...20 RIGHT TRANSMISSION COMPARTMENT TOOL S COMPARTMENT HEADER S FRAME ADAPTER S FRAME CARDAN SHAFT UK...
Страница 19: ...21 03 02 Machine Specifications UK...
Страница 26: ...28 04 03 Decals Positioning Scheme UK...
Страница 40: ...42 SUNSTORM SFH Series SPARE PARTS MANUALS...
Страница 42: ...44 TABLE PAGE 01 1 3 11 2013 COMPONENTI COMPONENTS www nardi harvesting com...
Страница 60: ...62 GALLERY AGRICULTURE SINCE 1980...
Страница 61: ...63 Note...
Страница 62: ...64 Note...
Страница 63: ...65 Note...