66
S 07
MAINTENANCE
HOSES & CLAMPS REPLACEMENT
NOTE!
The pictures shown may differ from your model.
Coolant & Sea water circuit
WARNING!
Do not remove the heat-exchanger cap when the engine
is hot. Then loosen cap slightly to the stop to relieve any
excess pressure before removing cap completely.
1. Drain the coolant.
2. Unscrew all the clamp bands.
3. Remove the 2 RSGU clamps (2).
4. Remove the sea water hose (3)
5.
Remove the coolant hose (4), (5), (6), (7), (8) & (9)
6.
Inspect and replace the sea water, coolant hoses and
clamp bands if necessary.
7.
Tighten the clamp bands.
Specification
Clamp bands -
Torque
5 N·m
(3.69 ft-lbs)
8.
Fill with clean water and anti-freeze until the coolant
level is just below the port. Install the radiator cap se-
curely.
Содержание Q2400 Series
Страница 1: ...NANNI GENERATOR SET USER MANUAL DGBXXT090041 Q2400 Series...
Страница 2: ......
Страница 4: ...4 Q00 TRACKED CHANGES...
Страница 8: ...8 S00 SUMMARY...
Страница 32: ...32 S03 FLUIDS...
Страница 38: ...30 S05 COMPONENTS...
Страница 40: ...32 S05 COMPONENTS VIEW N 1 OF THE GENERATOR SET...
Страница 41: ...33 S05 COMPONENTS VIEW N 2 OF THE GENERATOR SET...
Страница 53: ...53 S 07 MAINTENANCE...
Страница 76: ...76 S 07 MAINTENANCE ELECTRIC DIAGRAM 50Hz SINGLE PHASE...
Страница 77: ...77 S 07 MAINTENANCE ELECTRIC DIAGRAM 60Hz SINGLE PHASE...
Страница 78: ...78 S 07 MAINTENANCE...
Страница 80: ...80 S08 AL TERNATOR...
Страница 100: ...100 S08 AL TERNATOR...
Страница 108: ...108 S11 TROUBLE SHOOTING...
Страница 109: ......
Страница 110: ......