background image

NANAWALL WD66 OWNER’S MANUAL

If any anchorage or drain connection holes are made 
through these drain channels, make sure that they are 
properly sealed to prevent any water leakage. The open 
ends of these drain channels at each end of the sill 
should also be properly sealed.

 Alternative anchoring 

systems for the sill (without using screws through the 
drain channels) are using L brackets attached to both 
sides of the sill.

6. For better performance and protection, any exterior

folding system should be installed under an overhang
or with other similar protection.

7.

For better performance it is recommended that
all dead loads such as upper levels, roof, etc. be
constructed before a unit is installed.

Properly flash and waterproof around the perimeter 
of the opening, especially at the sill. Make sure you 
seek proper professional advice for the appropriate 
construction needed for your particular application. DO 
not install unit in structures that do not allow for proper 
management/drainage of moisture.

To avoid future problems, do not install your unit until the 
rough opening has been correctly prepared. 

Содержание WD66

Страница 1: ...6 Standard Wood Framed Folding System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through NanaWal...

Страница 2: ...However not included are screws bolts shims etc to anchor the unit to the rough opening The frame is shipped knocked down and needs to be assembled Panels are pre assembled with or without glass read...

Страница 3: ...e frame height of the unit ordered is measured from the bottom of the sill and not from the finished floor Allowance must be made in height for the portion of the sill that is below the measured openi...

Страница 4: ...protection any exterior folding system should be installed under an overhang or with other similar protection 7 For better performance it is recommended that all dead loads such as upper levels roof...

Страница 5: ...stomer s specific application requirements can be evaluated Your local paint professional should know of suitable finish systems that give satisfactory results in your region It is highly recommended...

Страница 6: ...stainless steel insert for the sill of floor supported WD66 u are in the correct place Illustration A1 Step A3 For top hung WD66 o L R with unhinged pairs of panels not connected to a side jamb see St...

Страница 7: ...c surrounding conditions must be properly designed and provided by others Drawings not to scale Details shown are subject to change without notice INWARD OPENING DETAILS OUTWARD OPENING DETAILS TOP HU...

Страница 8: ...s or other equivalent anchorage devices depending on the adjacent substrate material and construction Make sure they are corrosion resistant Anchorage devices should penetrate or hold sufficiently INW...

Страница 9: ...of 3 200 psi use 3 16 diameter ITW Tapcons concrete screws with 1 1 4 min embedment For masonry use 1 4 diameter ITW Tapcons masonry screws with 1 1 4 embedment Standard installation into light gage s...

Страница 10: ...nd free of any debris especially cuttings from drilled holes See Illustration A3 B PANELS AND FOLDING HARDWARE INSTALLATION IMPORTANT Look for glass stops to determine the interior side of a panel Ste...

Страница 11: ...t secures the assembly See also Illustration B3 Step B6 Attach the next panel to this folding pair by demounting the long screw of the running carriage that way that the hinge part of the next panel c...

Страница 12: ...panel If it is slightly lower not more than 1 16 it is okay Then along the entire width of the opening check the spacing between the sill and each panel which should be about 3 8 along the entire leng...

Страница 13: ...ep C11 Finish any waterproofing flashing trim and sealant needed around the perimeter of the opening Important Make sure any weep holes in the sill are not blocked Step C12 To prevent uncontrolled mov...

Страница 14: ...curity and weather resistance When closed please engage all locking mechanisms fully The correct sequence of opening and closing of panels is dependent on the configuration ordered Panels must be open...

Страница 15: ...side or a thumb turn on the inside Unlock and disengaging the locking points Unlock the lock with key or thumb turn By operating the door handle downwards the locking points at the top and the bottom...

Страница 16: ...al loading and forced entry 5 Periodically inspect the sealant caulking on the exterior perimeter of the unit It is extremely important that the sealant caulking remains intact and in good condition T...

Страница 17: ...jamb tracks should be free from all dirt and debris c There should be no standing water in the track in the sill d All hardware should be intact and operating properly 2 All surfaces must be cleaned w...

Страница 18: ...Insulating Glass shall meet the requirements of ASTM E 774 Class A B or C Although glass installation with the dry glazing system is relatively straight forward it is recommended that an experienced...

Страница 19: ...pry bar at the lower corner below the upper setting block These setting blocks should all fit snugly but should not be forced Adjust the thickness of the glass setting blocks such that the panel is sl...

Страница 20: ...ls have to be braced correctly for proper operation DIAGRAM 1 Setting blocks for tension Setting blocks to keep distance B r a c i n g D i r e c t i o n B r a c i n g D i r e c t i o n B r a c i n g D...

Страница 21: ...must be provided 3 Inward opening details are shown on this drawing Outward opening panels require the same installation fasteners at the same spacings 4 Installation fasteners shown in the raised si...

Страница 22: ...antial cracking chipping or peeling due to the deterioration of the finish exclusive of mechanical damage 2 chalking in excess of a numerical rating of 8 as per ASTM D 659 or 3 fading or color changes...

Страница 23: ...e of the affected product in full satisfaction of its obligations Wood Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit and prior to ex...

Страница 24: ...Product selection application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Instal...

Страница 25: ...faces Acts of God falling objects fire accidents external forces or other conditions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performanc...

Страница 26: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Отзывы: