NANAWALL WD66 OWNER’S MANUAL

10 

Step A10 

Anchor the side jambs to studs or walls. Make sure that 
the jambs are plumb and straight.

Be aware that the anchorage points in the side jamb with 
the lesser number of panels attached to it may in Step C6 
need to be loosened to be able to move the side jamb to 
adjust the total width of the unit.

Step A11 

As the sill is attached first, then the side jambs, now 
anchor the head jamb through the pre-drilled holes and 
shims. Make sure that the head jamb is level.

IMPORTANT: 

Make sure no shims are forced to 

ensure that frame sections are not bowed. Check

 

frame constantly to be certain that it is level,

 

plumb

and square. A transit and other similar precise

 

measuring equipment should be used to make these

 

determinations.

Step A12

IMPORTANT: 

Make sure that all the surfaces of the 

upper and lower tracks are clean and free of any 
debris, especially, cuttings from drilled holes. See 
Illustration A3.

B. PANELS AND FOLDING HARDWARE
INSTALLATION

IMPORTANT:

 Look for glass stops to determine the 

interior side of a panel.

Step B1

 

On top-hung WD66/o insert all the upper running 
carriages into the upper track, through the slot on 
one end of the head jamb. The lower running carriage 
functions as a guide in the sill. See also Diagram 2.

On floor supported WD66/u insert all lower running 
carriages into the sill. See Illustration B1. The upper 
running carriage is just a guide in the upper track. See 
also Diagram 2.

Step B2 

Looking at the elevation drawing, first install panel(s) 
hinged to the side jamb(s). Align the hinge components 
on the panel to the hinge components on the side jamb 
and insert the proper hinge pin. Insert the hinge pin in a 
way such that the security set screw fit into the groove in 
the hinge pin. Loosen the set screw as needed to insert 
the hinge pin, tighten till it touch the pin and then back off 
a full turn. Use an Allen key. See Illustration B2.

ILL. A3

Содержание WD66

Страница 1: ...6 Standard Wood Framed Folding System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through NanaWal...

Страница 2: ...However not included are screws bolts shims etc to anchor the unit to the rough opening The frame is shipped knocked down and needs to be assembled Panels are pre assembled with or without glass read...

Страница 3: ...e frame height of the unit ordered is measured from the bottom of the sill and not from the finished floor Allowance must be made in height for the portion of the sill that is below the measured openi...

Страница 4: ...protection any exterior folding system should be installed under an overhang or with other similar protection 7 For better performance it is recommended that all dead loads such as upper levels roof...

Страница 5: ...stomer s specific application requirements can be evaluated Your local paint professional should know of suitable finish systems that give satisfactory results in your region It is highly recommended...

Страница 6: ...stainless steel insert for the sill of floor supported WD66 u are in the correct place Illustration A1 Step A3 For top hung WD66 o L R with unhinged pairs of panels not connected to a side jamb see St...

Страница 7: ...c surrounding conditions must be properly designed and provided by others Drawings not to scale Details shown are subject to change without notice INWARD OPENING DETAILS OUTWARD OPENING DETAILS TOP HU...

Страница 8: ...s or other equivalent anchorage devices depending on the adjacent substrate material and construction Make sure they are corrosion resistant Anchorage devices should penetrate or hold sufficiently INW...

Страница 9: ...of 3 200 psi use 3 16 diameter ITW Tapcons concrete screws with 1 1 4 min embedment For masonry use 1 4 diameter ITW Tapcons masonry screws with 1 1 4 embedment Standard installation into light gage s...

Страница 10: ...nd free of any debris especially cuttings from drilled holes See Illustration A3 B PANELS AND FOLDING HARDWARE INSTALLATION IMPORTANT Look for glass stops to determine the interior side of a panel Ste...

Страница 11: ...t secures the assembly See also Illustration B3 Step B6 Attach the next panel to this folding pair by demounting the long screw of the running carriage that way that the hinge part of the next panel c...

Страница 12: ...panel If it is slightly lower not more than 1 16 it is okay Then along the entire width of the opening check the spacing between the sill and each panel which should be about 3 8 along the entire leng...

Страница 13: ...ep C11 Finish any waterproofing flashing trim and sealant needed around the perimeter of the opening Important Make sure any weep holes in the sill are not blocked Step C12 To prevent uncontrolled mov...

Страница 14: ...curity and weather resistance When closed please engage all locking mechanisms fully The correct sequence of opening and closing of panels is dependent on the configuration ordered Panels must be open...

Страница 15: ...side or a thumb turn on the inside Unlock and disengaging the locking points Unlock the lock with key or thumb turn By operating the door handle downwards the locking points at the top and the bottom...

Страница 16: ...al loading and forced entry 5 Periodically inspect the sealant caulking on the exterior perimeter of the unit It is extremely important that the sealant caulking remains intact and in good condition T...

Страница 17: ...jamb tracks should be free from all dirt and debris c There should be no standing water in the track in the sill d All hardware should be intact and operating properly 2 All surfaces must be cleaned w...

Страница 18: ...Insulating Glass shall meet the requirements of ASTM E 774 Class A B or C Although glass installation with the dry glazing system is relatively straight forward it is recommended that an experienced...

Страница 19: ...pry bar at the lower corner below the upper setting block These setting blocks should all fit snugly but should not be forced Adjust the thickness of the glass setting blocks such that the panel is sl...

Страница 20: ...ls have to be braced correctly for proper operation DIAGRAM 1 Setting blocks for tension Setting blocks to keep distance B r a c i n g D i r e c t i o n B r a c i n g D i r e c t i o n B r a c i n g D...

Страница 21: ...must be provided 3 Inward opening details are shown on this drawing Outward opening panels require the same installation fasteners at the same spacings 4 Installation fasteners shown in the raised si...

Страница 22: ...antial cracking chipping or peeling due to the deterioration of the finish exclusive of mechanical damage 2 chalking in excess of a numerical rating of 8 as per ASTM D 659 or 3 fading or color changes...

Страница 23: ...e of the affected product in full satisfaction of its obligations Wood Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit and prior to ex...

Страница 24: ...Product selection application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Instal...

Страница 25: ...faces Acts of God falling objects fire accidents external forces or other conditions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performanc...

Страница 26: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Отзывы: