Subject to change without prior notice
INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS
FIRE PUMPS - NF-VTP SERIES
Ref. No. NFVTP-IOM/
2016
/V.
02
CONTENTS
II of II
6.2. Start up
27
6.3. Methods of Stopping
27
6.4. Field Acceptance Test Form for Fire Pump Set
28
7. MAINTENANCE
28
7.1. Weekly Inspection And Testing
28
7.2. Visual Inspection
28
7.3. Jockey Pump – Testing
29
7.3. Electric Fire Pump – Test Procedure
29
7.4. Diesel Fire Pump – Test Procedure
29
8. DISMANTLING AND REASSEMBLY
30
8.1. General
30
8.2. Gland Packing Replacement
30
8.3. Dismantling
31
8.4. Inspection, Replacement and Reassembly
33
8.5. Exploded View of Split case Fire Pump
34
8.6. Parts Details of Vertical Turbine Fire Pump
35
9. SPARE PARTS, TOOLS & CONSUMABLES
35
9.1. Spare Parts Policy
35
9.2. Recommended Spare Parts
36
9.3. Recommended Tools And Instruments
36
9.3. Recommended Consumables
36
9.4. Recommended Lubricant Standards
36
10. FAULTS & REMEDIES
37
11. FIRE PUMP INSPECTION, TESTING AND MAINTENANCE SCHEDULE
40
11. FIRE PUMP INSPECTION, TESTING AND MAINTENANCE SCHEDULE
41
11. FIRE PUMP INSPECTION, TESTING AND MAINTENANCE SCHEDULE
42
11. FIRE PUMP INSPECTION, TESTING AND MAINTENANCE SCHEDULE
43
11. FIRE PUMP INSPECTION, TESTING AND MAINTENANCE SCHEDULE
44
12. POLICY ON WARRANTY OF NAFFCO PUMP SETS
45
NOTES
46