1.0
Introduction
03
2.0
Warnings & Safety Measures
03
3.0
Heating System Design
03
4.0
Unit Selection/Sizing
04
5.0
Location 04
6.0
Preparation 05
7.0
Fixing
06
8.0
Water Connection
07
9.0
Electrical Connection
08
10.0
Commissioning Procedure
11
11.0
Technical Data
12
12.0
Control System Set-up and Operating Instruction
13
12.1 Unit Operation
13
12.2 Operating Modes
15
12.3 Installer’s Set-up Parameters
16
12.4 Building Management System Input Set-up
16
12.5 Program Mode
17
13.0
Troubleshooting
18
14.0
Maintenance
19
15.0
Spare Parts & Accessories
19
Contents
24197 iVector Installation Guide V2_Layout 1 28/11/2011 14:49 Page 3
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - [email protected] 0844 556 1818