05
iVECTOR Heater/Cooler
6.0 Preparation
Before proceeding with the installation, remove the carton lid,
unpack the contents carefully and check against the checklist
below:
1.
Heater Cooler unit (chassis)
2.
Outer Casing
3.
Warranty Card
4.
Instruction Manual
5.
Fixing kit
Check contents for concealed shipping damage.
Tools required:
Ma
nua
l
Wa
rra
nty
Exploded View
Grill
Grill hinge
Outer casing
Filter
Side cover
Control panel
Chassis
1
2
3
5
4
Model
A
B
Dimensions (mm)
iV080
800
503
iV100
1000
703
iV120
1200
903
iV140
1400
1103
iV160
1600
1303
3.0
4.0
5.0
6.0
Mounting dimensions
24197 iVector Installation Guide V2_Layout 1 28/11/2011 14:49 Page 6
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - [email protected] 0844 556 1818