Section 1
MVE466 System Board
Chassis Installation
The MVE486 is designed to fit both “Baby AT” and
“Full AT’ style chassis. While both these styles of
chassis are generally recognized throughout the sys-
tem board and chassis industry, some chassis may
have slightly off-set dimensions due to manufacturing
tolerances or design implementation. Therefore, it is
suggested that before the system board is physically
installed, the board be put into place to assure proper
fit. Note the locations where screws can be installed
and where the nylon stand-offs can be used. For
proper grounding, at least 2 screws should be used to
lock the system down. See figure l-4. These two
locations are the most commonly used points for
screw mounting locations. If more screw mounting
locations are available, it is highly recommended that
they be used as well.
Once the locations for both the screws and the nylon
stand-offs have been identified, remove the board,
insert the nylon stand-offs, making sure all the stand-
offs are in their proper position and are not causing the
board to warp. Then install the board into the chassis.
Then lock the system board into place by installing the
screws. Do not over-tighten. Usually
turn after the
screw-head makes contact is sufficient to assure a
good ground.
Figure
Port Connections for
MVE488
Copyright 1993
Version DO1