9
WALL ARM FITTING FOR Atmos Zinc/Zone
1.
Establish position of wall arm to suit users requirements (See Fig 22).
2.
When fitting a ceiling arm you will have to fit a cross bearer between two joists.
Drill suitable 19mm hole through ceiling (See Fig 23).
3.
Remove fittings and nuts from end of arm and push arm through wall, re-fit washer
and nut.
4.
Connect mixed water outlet using compression and fittings.
5.
When attaching a fixed overhead make sure the sealing washer is in place and
screw tight to seal the joint.
23
22