!!
!""##"$"%"##"$"
"
STEP 14:
Threading of Cable for Adjustable Hi/Low Pulley
Starting at end of the cable that attaches to the handle, thread the cable between
the 2 pulleys in the metal pulley housing the up and over the 2 pulleys on the
underside of the boom. It continues down and under the pulley screwed into
the selector stack then up and over another pulley on the underside of the boom.
Continue down and under a pulley on the base frame then over and under the
other pulley connected to the base adjustable column. Finally, the end of the
cable connects to the underside of the sliding height adjusting carriage.
78