7.1.2.5. Checking the tightness of the working platform bolts
Figure. 7.1.2.5. - 177. Working platform bolts
1. Check that the 6 M12 bolts (2) of the working platform are tight.
Tighten the bolts, if needed.
2. Check that the 4 M16 bolts (1) near the lifting cylinder are tight.
Tighten the bolts, if needed.
Figure. 7.1.2.5. - 178. Working platform U-bolts
3. Check that the 8 M8 nuts (2) on the 4 U-bolts (1) are tight.
Tighten the bolts, if needed.
Operation and maintenance manual
1.00
FX300 and FX400 SeedPilot
141 (208)
Содержание FX300 SeedPilot
Страница 200: ...Hydraulic schematics FX300 and FX400 1 Hydraulic schematics FX300...
Страница 201: ...Hydraulic schematics FX300 and FX400 2...
Страница 202: ...Hydraulic schematics FX300 and FX400 3 Hydraulic schematics FX400...
Страница 203: ...Hydraulic schematics FX300 and FX400 4...
Страница 204: ...Electrical schematics FX300 and FX400 1 Electrical schematics...
Страница 205: ...Electrical schematics FX300 and FX400 2...