Running the Example HCF Test
Landmark™ Test System Operation
97
Run the Test
1. Run the test.
A. From the MTS TestSuite controller panel, reset the interlock if necessary.
B. Power up the HPU and HSM by clicking the
Power Low
and
Power High
buttons in
sequence. Use the button in the lower right corner of the Power Panel to access the
HPU power buttons.
C. Click the
Run
button. The test will start. Run the test a total of five times to complete
1000 cycles.
Содержание Landmark 370 Series
Страница 39: ...System Introduction Landmark Test System Operation 39...
Страница 40: ......
Страница 99: ...Running the Example HCF Test Landmark Test System Operation 99 Generate a Report 1 Generate a report...
Страница 114: ......
Страница 122: ......
Страница 123: ...Decommissioning Landmark Test System Operation 123 Decommissioning Decommission 124...
Страница 131: ...Index Landmark Test System Operation 131 Z zero sensor Auto Offset 73 sensor see Auto Offset 67...
Страница 132: ......
Страница 133: ......