Action
Inspection
3.
Verify that the two tags have been detected by the network switch and
check the received signal strength is within specification (Refer to
commissioning data).
Testing RF RX path for WAC 2
1.
Stand 50M away from the ImPact NS50 with two MST RFID tags.
2.
Open the NS50 web browser interface and select the
STATUS
>
TAGS
web page.
3.
Verify that the two tags have been detected by the network switch and
check the received signal strength is within specification (Refer to
commissioning data).
Open the front cover and check inside for water and dust.
Ingress
Revision C
110
NS50 User Guide
Maintenance Check-list
Содержание Impact NS5001
Страница 1: ...NS50 Wireless Network Switch User Guide Revision C NS50_UG_EN_C ...
Страница 2: ......
Страница 6: ...Revision C 6 NS50 User Guide ...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 24: ......
Страница 42: ......
Страница 48: ......
Страница 98: ......
Страница 100: ...Revision C 100 NS50 User Guide Device Discovery ...
Страница 104: ......
Страница 108: ......
Страница 112: ......
Страница 116: ......
Страница 118: ......