
Table of Contents
Location
Title
Section 1
General
1.00
1.10
Recommended Shipping & Storage
1.20
Drawings-Complete Pump Assembly
1.30
Drawings-Pump Assembly-Overall Dimensions
1.40
Drawing-Dual Pump Configuration-Overall Dimensions
1.50
Drawings-Gear Reducer Installation Positions
1.60
1.70
Section 2
Initial Inspection & Break-in
2.00
2.10
2.20
2.30
Start-up & Testing Considerations
2.40
2.50
Warm-up Prior to Rotating Pump
Section 3
Preventative Maintenance
3.00
3.10
First 100 Hours of New Pump Operation
3.20
Daily Preventative Maintenance
3.30
Weekly Preventative Maintenance
3.40
Every 100 Hours Preventative Maintenance
3.50
Every 250 Hours Preventative Maintenance
3.60
Yearly or as Required Preventative Maintenance
3.70
Содержание QI-1000
Страница 7: ...1 20 Drawings Pump Assembly Overall Dimensions All Plunger Sizes TI 600 TRIPLEX...
Страница 8: ...QI 1000 QUINTUPLEX...
Страница 9: ...1 30 Dual Pump Assembly Overall Dimensions 1 30 1 600 HP Dual Pump Assembly Overall Dimensions...
Страница 10: ...1 30 2 1000 HP Dual Pump Assembly Overall Dimensions...
Страница 11: ...1 50 Drawings Gear Reducer Installation Positions 1 50 1 Gear Reducer Position Left Hand...
Страница 12: ...1 50 2 Gear Reducer Position Right Hand...
Страница 22: ...4 6 Lubrication Attachment Points See images below showing lubrication inlet and outlet locations...
Страница 36: ......
Страница 39: ...5 50 Power Frame Crank Rotation NOTE Crank Rotation can either be clockwise or counterclockwise...
Страница 43: ...Fluid End Assembly 3 25 4 50 continued...