Wizard Up30 Rev. 4 28/04/2017
22
FIRST STARTING
At the starting of the lift, the installer and/or dealer must fill the ‘Initial test’ included in the manual and the
user must be verify that such form is sent by fax to HTC Srl Unipersonale at the 39 085 94624621.
Warning! Only skilled and authorized personnel should be allowed to perform these operations only
after they have followed a course at least of one day in our company for the assembly of the equipment.
Carefully follow all instructions shown below to prevent possible damage to the car lift or risk of injury
to people.
Be sure that the operating area is cleared of people.
Be sure that hydraulic pipes and electric wires, connecting control box with lift, are protected by mean
of metallic carters. The carters must be supplied as o.e. with the lift.
After positioning the lift as specified and performing electric and hydraulic connections, the lift can be operated by
following the specific procedure. Open the front door of the control box and unscrew the oil tank cap add hydraulic oil
with a grade of viscosity
32/46 CST
or equivalent
(Tank capacity: 9 litres – Requirement circuit: 12 litres)
.
NOTE: THESE OPERATIONS MUST BE PERFORMED WITHOUT LOADING
1. Put the main switch to position 1. (nr. 1)
2. Fill the tank with oil.
3. Verify that all the manual operators
(OMA1-OMB1)
are perfectly closed.
4. Push the lifting button until you reach the max height. If the lift doesn’t move, check the motor: if it works,
verify that it works in the right way – otherwise, invert the phases on the electric line.
5. Put enough oil in the tank to execute the bleeding procedure
.
6. Push the
EF
button (end-stroke high micron excluxion nr. 3) that is located on the right side of the power unit
(pic. 13) and keep pushed, contemporaneously push the raising button (nr. 2) as pulses of 2-3 seconds until
the hydraulic circuit is full. When the oil levell in the tank is steady (that means that it not fall anymore), the
procedure is completed. This operation let the self-bleeding of the cylinders and the self-levelling of the
platforms.
7. After that operation, do some session of raising/lowering without load…if the lift is levelled the bleeding
operation is completed. Otherwise repeat the operation at the point 6.
8. When you are sure that the lift is well aligned (maximal difference must be 1-2cm at the beginning/ending),
you may proceed with the loading of the vehicles.
N.B.: IN TIME COULD HAPPEN AN UN-LEVELLING OF THE PLATFORMS DUE TO LITTLE OIL LEAK IN THE
HYDRAULIC CIRCUIT. IN THIS CASE YOU HAVE TO REPEAT THE PROCEDURE AT THE POINT 6
WITHOUT
LOAD.
Pic. 13
1
2
3
Содержание WIZARD UP 30
Страница 9: ...Wizard Up30 Rev 4 28 04 2017 8 OVERALL DIMENSIONS Pic 6 ...
Страница 10: ...Wizard Up30 Rev 4 28 04 2017 9 Pic 6 ...
Страница 11: ...Wizard Up30 Rev 4 28 04 2017 10 Pic 6 ...
Страница 12: ...Wizard Up30 Rev 4 28 04 2017 11 Pic 6 ...
Страница 19: ...Wizard Up30 Rev 4 28 04 2017 18 ELECTRIC SYSTEM CONNECTION THREEPHASE Pic 11 ...
Страница 20: ...Wizard Up30 Rev 4 28 04 2017 19 Pic 11a ...
Страница 22: ...Wizard Up30 Rev 4 28 04 2017 21 Pic 12 14 mm 14 mm ...
Страница 30: ...Wizard Up30 Rev 4 28 04 2017 29 Pic 16 ...
Страница 31: ...Wizard Up30 Rev 4 28 04 2017 30 ...
Страница 33: ...Wizard Up30 Rev 4 28 04 2017 32 ...
Страница 34: ...Wizard Up30 Rev 4 28 04 2017 33 CONTROL BOX Pic 20 a Pic 20 b 33 23 24 25 1 29 3 18 22 32 16 ...