USER MANUAL
MGAprime
MRU GmbH, D-74172 Neckarsulm
61 / 126
Connecting Gas moisture bottle
NOTE
Fresh air and dry test gas must always be humidified to
prevent the gas cooler from drying out. To humidify the
test gas you can, for example, connect a gas moisture bot-
tle. If you are using an Acid Dosing Unit APE the humidifi-
cation is replaced by the Acid Dosing Unit APE.
1
Fresh air inlet
2
Distilled Water
3
Ambient air
4
Ambient air (wet)
5
Zero gas nozzle
6
Water stop filter
►
Connect the hose to the fresh air inlet (1) of the analyser.
►
Connect the hose to the zero-gas nozzle (5) of the gas cylinder.
ATTENTION
A wrongly connected hose sucks water into the
analyser.
►
Connect the hose to the zero gas nozzle of the Gas
moisture bottle.
►
Do not connect the hose to the inlet nozzle of the ambi-
ent air.
Connecting Acid Dosing Unit APE
See also Chapter 3.11 Acid injection, Page 19.
Содержание MGAprime
Страница 1: ...MGAprime USER MANUAL 9452EN PR...
Страница 121: ...User Manual MGAprime MRU GmbH D 74172 Neckarsulm 121 126 Click on the Connect Icon The analyser is connected...
Страница 125: ...User Manual MGAprime MRU GmbH D 74172 Neckarsulm 125 126 16 Declaration of conformity...
Страница 126: ......