
USER MANUAL
MGAprime
MRU GmbH, D-74172 Neckarsulm
21 / 126
4
Operation
4.1.
Commissioning
The analyser leaves the factory assembled and ready for use.
►
Check the analyser regarding completeness and integrity.
►
Connect the analyser to the mains.
The analyser switches on.
The operating system boots.
Blue LEDs for ON and power supply are switched on.
(In the event of an error, the Power LED lights red)
The device runs through a start routine of 30 minutes.
The start routine includes:
•
self-test
•
warm-up of the NDIR bench
•
cool down of the double stage gas cooler, indicated by the symbol
•
Zeroing, indicated by symbol.
The remaining time until the end of zeroing is
displayed.
4.2.
Operating panel
All functions are controlled via the touch surface of the instrument.
Different gestures are available in the individual menus and windows.
Содержание MGAprime
Страница 1: ...MGAprime USER MANUAL 9452EN PR...
Страница 121: ...User Manual MGAprime MRU GmbH D 74172 Neckarsulm 121 126 Click on the Connect Icon The analyser is connected...
Страница 125: ...User Manual MGAprime MRU GmbH D 74172 Neckarsulm 125 126 16 Declaration of conformity...
Страница 126: ......