7 Maintenance
Maschinenfabrik Reinhausen GmbH 2020
70
5788897/03 EN
VACUTAP
®
VVS
®
4.
CAUTION!
Risk of crushing. Carefully place the on-load tap-changer
head cover horizontally on the on-load tap-changer head, making sure
that you do not place your fingers between the on-load tap-changer head
and on-load tap-changer head cover. Align the output shaft of the upper
gear unit such that it engages in the corresponding hollow shaft in the on-
load tap-changer head.
Figure 61: Lowering on-load tap-changer head cover
5. Screw the on-load tap-changer head cover onto the on-load tap-changer
head.
Figure 62: On-load tap-changer head cover
6. Fill the oil conservator with fresh insulating fluid.
7. Vent the on-load tap-changer head via air-vent valve E1 on the on-load
tap-changer head cover. To do this, remove screw cap and lift valve tap-
pet with a screwdriver.
8. Seal air-vent valve E1 with screw cap (tightening torque 10 Nm).
Содержание VACUTAP
Страница 1: ...On load tap changer VACUTAP VVS Operating Instructions 5788897 03 EN ...
Страница 82: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 82 5788897 03 EN VACUTAP VVS 9 Drawings ...
Страница 93: ......
Страница 94: ......
Страница 95: ......