4 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
32
5788897/03 EN
VACUTAP
®
VVS
®
2. Remove the screw cap on the air-vent valve E1, lift the valve tappet with a
screwdriver and bleed the on-load tap-changer head.
Figure 18: Air-vent valve E1
3. Seal air-vent valve E1 with screw cap (tightening torque 10 Nm).
4.1.2.2 Bleeding suction pipe on pipe connection S
1. Remove the screw cap on the pipe connection S, open the vent screw
and bleed the piping.
Figure 19: Pipe connection S
2. Close vent screw.
3. Seal vent screw with screw cap.
Содержание VACUTAP
Страница 1: ...On load tap changer VACUTAP VVS Operating Instructions 5788897 03 EN ...
Страница 82: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 82 5788897 03 EN VACUTAP VVS 9 Drawings ...
Страница 93: ......
Страница 94: ......
Страница 95: ......