
6.3.3 Control Signal Installation (Optional-Not Required)
Using machine tool control signals is not recommended by
MP SYSTEMS
. If required for
your application, please contact
MP SYSTEMS
for more information.
•
The CDR can be automatically turned on and off by connecting to a machine
signal.
•
This signal will also keep track of machine run time vs CDR run time.
•
Identify a device or signal in the machine that will turn on whenever the machine
is in a “ready” or “running” state.
DO NOT connect to the E-stop circuit.
•
MP Systems recommends connecting into the Green Tower Light 24vdc signal.
•
This signal is always on when the machine is running in auto mode.
•
Install the provided multiconductor cable into the machine cabinet and ensure
there is enough length of cable to reach the CDR electrical panel.
•
Connect the two ends of the 14pin connector together beneath the CDR e-panel.
•
Remove pink jumper wire from inside CDR e-panel if using this function.
•
Locate the green light output from the machine. Cut wire and crimp female tab
onto output wire close to output connect. Connect MP wire #1 (CDR Run Signal)
along with green light wire into male tab. Connect both tabs together. Connect
MP Wire #5 (0v) to the light’s 0v reference source.
•
If using external signal, function will need to be enabled on PLC.
•
To configure, enter PLC settings by pressing buttons 1 & 2 on PLC keypad.
•
Enter pass “0515” and press enter button to cycle through screens.
•
On the external signal screen, change the setting from 0 to 1 and press enter.
•
*Warning, pump may auto start*
•
The screen will now
display “AUTO” and the function is now enabled.
•
Note: Other signal(s) may be used. Wires #9 (MP +24v) & #1 (Pump On) can be
wired across normally open dry contacts if available.
Содержание CDR80
Страница 4: ......
Страница 18: ...4 3 Floor Layout Standard CDR Dimensions ...
Страница 19: ... Severe Duty Models Only Extra Capacity Pre Filter Dimensions ...