3
2
EN
A. Fixation of the compressor B200 version PF
o
1
Using of the kit delivered by MOUVEX Integrating the metallic
gasket, the 4 Nord Lock washers and the 4 nuts.
o
2
Nuts tightened to 37 Nm.
o
3
Dripstone turned down.
o
4
Screws tightened at 13 Nm.
Quick Start Guide
|
SCREW COMPRESSORS – B200
CONTROL CHECK LIST
Installation Of The Compressor B200 Flow control
B. Suction
1
Air Filter
o
•
Rain cap in place.
o
•
Clogging indicator visible.
o
•
Cartridge in place and clean.
2
Hose (supplied with the compressor) :
o
•
1. Hose adjusted to the installation. Clean inside.
o
•
2. & 3. Nipples in place on the hose.
o
•
4. Heat shrinkable sleeves in place.
o
•
5. & 6. Clamps in place and tightened.
B. Discharge
o
1
The graphite flange gasket MOUVEX (REF 228065) is in place.
o
2
Screws tightened at 44 Nm.
o
3
A 90° elbow is fitted on the flange.
o
4
PF version: the discharge hose delivered is fitted on that elbow. If arrow presence, turn the hose in the good direction.
o
5
Other versions (PS et HY): the piping fitted on the elbow has a downward slope.
o
6
All the connections must be welded.
o
7
Silencer (option)
o
8
Rigid pipe Ø 1" ½
o
9
Check Relief valve MOUVEX
o
10
There is a plug at the end of the pipe.
o
11
The waterproofness of the whole piping has to be checked.
5
3
4
1
4
2
6