![Mountz PTT-2000 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/mountz/ptt-2000/ptt-2000_operating-instructions-manual_1840934023.webp)
Corporate Headquarters:
1080 North 11th Street, San Jose, CA 95112 Phone: (408) 292-2214 Fax: (408) 292-2733
www.etorque.com
Page 23
The Tool Test also supports Load Cells in Peak mode. See the screen shot below as an example of a Tool Test using a
Load Cell.
Connectors for connecting the PTT to Load Cells are available from Mountz. These are pre-wired except for the Load
Cell connections. They are:
Connector
Mountz Part Number
For 2mV/V Load Cells
072008
For 4 mV/V Load Cells
072009