![Motorola MVME5500 Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/motorola/mvme5500/mvme5500_installation-and-use-manual_245422041.webp)
2-1
2
2
Startup and Operation
Introduction
This chapter gives you information about:
❏
the power-up procedure
❏
switches and indicators
Applying Power
After you verify that all necessary hardware preparation is complete and
all connections are made correctly, you can apply power to the system.
When you are ready to apply power to the MVME5500:
❏
Verify that the chassis power supply voltage setting matches the
voltage present in the country of use (if the power supply in your
system is not auto-sensing).
❏
On powering up, the MVME5500 brings up the MotLoad prompt,
MVME5500>
.
Switches and Indicators
The MVME5500 board provides a single pushbutton switch that provides
both Abort and Reset (ABT/RST) functions. When the switch is depressed
for less than three seconds, an abort interrupt is generated to the processor.
If the switch is held for more than three seconds, a board hard reset is
generated.