1-10
Literature Center Web Site
Hardware Preparation and Installation
1
J6
J7
J6
J7
Rear P2 Ethernet
Front-Panel Ethernet
(factory configuration)
J100
J100
J101
J101
1 2 3
2
1
J34
3 2 1
3 2 1
1 2 3
3 2 1
1 2 3
1 2 3
3 2 1
2
1
J97
2
1
J98
J99
2
1
J34
2
1
J97
2
1
J98
2
1
J99
2
1
J28
J32
J28
J32
3 2 1
3 2 1
3 2 1
3 2 1
PMC Mode
SBC/IPMC712 Mode
(factory configuration)
J28
J32
3 2 1
3 2 1
SBC/IPMC761 Mode
J102 –
3 2 1
P2 PMC 2 I/O
J110
J102 –
3 2 1
P2 IPMC I/O
J110
(factory configuration)
(extended SCSI)