CPCI-6020 CompactPCI Single Board Computer Installation and Use (6806800A51C
)
Hardware Preparation and Installation
Overview of Start-up Procedure
36
Shipment Inspection
To inspect the shipment, perform the following steps:
1.
Verify that you have received all items of your shipment.
2.
Check for damage and report any damage or differences to customer service.
3.
Remove the desiccant bag shipped together with the board and dispose of it
according to your country’s legislation.
2.3
Overview of Start-up Procedure
The following table lists the things you will need to do before you can use this board and tells
you where to find the information you need to perform each step. Be sure to read this entire
chapter, including all Caution and Warning notes, before you begin.
The product is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, contact customer service immediately.
Table 2-1 Startup Overview
Task
Page
Unpack the hardware.
Chapter 2,
Unpacking and Inspecting the Board,
on
page 35
Configure the hardware by setting jumpers
on the boards.
Chapter 2,
Jumper Settings,
on page 41
Ensure CompactFlash card is installed (if
required).
Chapter 2,
CompactFlash Memory Card Installation,
on page 46
Ensure memory mezzanines are properly
installed on the board.
Chapter 6,
RAM500 Module Installation,
on page 118
Install PMC Module
(if required).
Chapter 2,
PMC Module Installation,
on page 44
Install the CPCI-6020 in the chassis.
Chapter 2,
Installing and Removing a Module,
on page
51
Install PIM on CPCI-6020-MCPTM-01
(if required)
Chapter 7,
Installing the PIM,
on page 138
Install peripherals, and any other devices or
equipment used.
Appendix A,
Manufacturers’ Documents, on page 161
Power up the system.
Chapter 2,
Hardware Preparation and Installation
Ensure that the debugger initializes the
CPCI-6020
Chapter 5,
Firmware
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com