13
78mm
78mm
∅50mm
78mm
∅50mm
1
2
3
EN
05. MAINTENANCE
INSTRUCTIONS FOR WATER DRAINAGE
OPTION B
OPTION B
OPTION A
OPTION A
Drill
(Ø50mm)
the drain hole.
DRILLING
Mark the site where you want to place the drainage hole
(Ø50mm)
, taking into account the
dimensions indicated for the option you want:
• OPTION A:
Flow within the BRISA SOLAR standard leg
• OPTION B:
Flow through another method designed by the customer
It is important create drainage points in the
BRISA SOLAR
to avoid accumulation of water inside the
frame. Follow the instructions and recommendations below.
DRAINAGE ZONES
LEG / TUBE FIXING
OPTION A:
Fix the leg to the profile using the screws for this purpose, making sure that the water to
be channeled to the ground.
OPTION B:
Apply the method you designed to make the water flow from the hole to the ground (eg:
drainpipe).
Great
er than 5000 mm
1
2
4
NOTE:
For installations on awning with legs, it is recommended to drain through the inside of
the leg. This method avoids the use of tubes and other accessories.
The drainage zones are made per awning (see page 4A):
• On the
4 corners of each awning
;
• In projection, every
5 meters away
.
Note:
In large projection awnings, it is necessary
to create additional drainage points along the side
profiles of the frame, so that they are never more
than 5mt apart