ARDAC WACS-2 Specification and Adjustment Manual
44X477 Rev. 8
05/ 16/ 03 2-1
2
2.
Host Machine Installation
Host Installation & Setup
When the WACS-2 is connected to the host, the 2-pin connector attaches to the host power supply and the
DB-25 (Or optional DB-9) connector is used for communications.
Installation Overview
The WACS-2 is to be installed only in equipment built in accordance with the application data and
specifications provided in Section 1, Description and Specifications. The basic WACS-2 installation
consists of mounting the chassis in the host and securing the acceptor and stacker into the chassis. Because
the WACS-2 systems are modular, the modules of any WACS-2 systems are interchangeable with the
modules of any other WACS-2 systems of the same type.
To install Money Controls World Acceptor Cassette System 2 (WACS-2) unit into the host equipment:
- Fit the chassis into the host equipment and secure it in place by the mounting nuts captive in the chassis
body. Refer to Chassis Mounting Requirements in Chapter 1.
- Connect the DB-25 (Or optional DB-9) connector, and two pin connector on the chassis wiring harness to
the matching connectors of the host equipment.
- If necessary install a new or up-graded EPROM / FLASH. Ordinarily this is done at the factory before
shipment.
- Verify the proper DIPswitch settings and reset as required.
- Install the cassette stacker module into the chassis.
- Install the note acceptor module into the chassis.
- Apply power to the assembled System through the host equipment.