
Chapter Four: Operation
How To Reassemble the Unit After Bakeout
37
Warm Up and Start Up
1. Apply power to the transducer. The power requirement is ±15 VDC (±5%) @ 35 mA.
2. Vacuum-pump the system to a pressure below the transducer’s resolution (0.01% F.S.).
Allow a minimum of 15 minutes for the electronics to stabilize.
3. Zero the output of the transducer by adjusting the zero potentiometer on the electronics
unit or on the power supply/readout unit (if using an MKS power supply/readout unit).
The instrument is ready for normal operation.
Содержание Baratron 121A
Страница 3: ...113733 P1 Rev C 7 98 MKS Baratron Type 121A Absolute Pressure Transducer...
Страница 7: ...Table of Contents v Appendix D High Pressure Fitting Selection 49 Description 49 Index 51...
Страница 8: ...Table of Contents vi...
Страница 10: ...List of Figures and Tables viii...
Страница 30: ...Customer Support Chapter One General Information 20 This page intentionally left blank...
Страница 42: ...Labels Chapter Three Overview 32 This page intentionally left blank...
Страница 48: ...How To Reassemble the Unit After Bakeout Chapter Four Operation 38 This page intentionally left blank...
Страница 50: ...Overpressure Considerations Chapter Five Theory of Operation 40 This page intentionally left blank...
Страница 52: ...General Information Chapter Six Maintenance 42 This page intentionally left blank...
Страница 58: ...Companion Products Appendix C Companion Products and Cables 48 This page intentionally left blank...
Страница 60: ...Description Appendix D High Pressure Fitting Selection 50 This page intentionally left blank...
Страница 62: ...Index 52...