IPB-5000A
6. Discription of Display Screens
6-4
As the following, each item of
(a)
to
(h)
put on the Control Screens,
①
,
②
and
④
is described.
(
a
)
SCHEDULE #
It denotes No. of weld
SCHEDULE
. 127 weld schedules as
SCHEDULE#1
to
#127
can be set on
IPB-5000A
.
(
b
)
TIME
Time period of each movement in welding is set at the dimension of ms.
Refer to
9. Time Chart
on the relation of each period.
SQD
/ Squeeze Time
Period of time until proper squeeze is applied to
work piece
WE1
/ Weld 1 Time
The first weld time for which weld current is
supplied
COOL
/ Cooling Time
Period during which weld current is suspended
between
WE1
and
WE2
WE2
/ Weld 2 Time
The second weld time for which weld current is
supplied
HOLD
/ Hold Time
Period of time to hold work piece after ceasing
weld current
(
c
)
UPSLOPE
Set the upslope time
(
to increase the weld current gradually
)
(
See
9.Time
Chart
)
. Set it for
WE1
and
WE2
respectively.
(
d
)
DOWNSLOPE
Set the downslope time
(
to decrease the weld current gradually
)
(
See
9.Time
Chart
)
. Set it for
WE1
and
WE2
respectively.
(
e
)
CURR
Indicates the value of current for control. Set it for
WE1
and
WE2
respectively.
(
f
)
TR #
Indicates the number of a transformer.
(
g
)
VOLT
Indicates the value of voltage for control. Set it for
WE1
and
WE2
respectively.
(
h
)
POWER
Indicates the value of power for control. Set it for
WE1
and
WE2
respectively.