9
Installation: general guidelines
The installation area should be able to cope with the weight, in-
coming pipes and discharge pipe when full. Full weights are listed
Positioning of the cylinder
Position of the cylinder should suit the installation; all connections
should be to the front for ease of access. Ensure suitable space is
left for access for repair and/or replacement of immersions and
valves etc.
Ensure atleast 300mm of vertical clearance above the
cylinder.
Refer to page 5 for cylinder heights and the diagram
below for guidelines on space requirements:
Nominal di-
ameter
n
D
(mm)
Space re-
quirement S
(mm)
475
610
565
700
In the case of an unvented installation, install of this
product should only be carried out by a “competent
operative” i.e. the installer must have attended a
recognised course in unvented hot water systems or
received appropriate training in their apprenticeship.
All registered operatives should carry an Identifi-
cation Card issued by the institute of Unvented Hot
Water Systems.
610
850
S
S
n
D
Содержание M0008
Страница 15: ...15 Installation electrical...
Страница 16: ...16 Installation electrical...
Страница 33: ...33 Service record Service date Serviced by Comments...
Страница 35: ......