4 - 23 4 - 23
MELSEC-A
4 SETUP AND PREPARATION BEFORE OPERATION
4.11 Maintenance and Inspection
There are no special inspection items for the AJ65VBTCU-68DAVN module, but follow
the inspections items describes in the PLC CPU User's Manual so that the system can
always be used in the best condition.