3-93
Parallel I/O unit
3 Controller
■ Installation method
The expansion parallel input/output unit is installed outside of the controller. Connect with the network
connection cable (NETcable-1) from the RIO connector in the rear/into of the controller.(Terminator is connected
at the time of shipment)
Fig.3-39 : Installing the parallel I/O unit (CR2DA-700)
60
54
6
Ra
di
at
io
n/
wi
ring spa
ce
15
0
6
15
6
2-M5 screw
6
16
8
Heat
radi
at
ion
space
128
(175)
10
0
Wiring
space
(40)
<2A-RZ361>
Installation dimensions of 2A-RZ361
6
downside
upside
Control panel installation dimensions
<CR2DA-700>
RIO コ ネ ク タ
(The controller outside installation.)
Содержание MELFA RV-12SD
Страница 2: ......
Страница 11: ...Contents iii Page 7Appendix Appendix 129 Appendix 1 Specifications discussion material Appendix 129...
Страница 141: ......
Страница 142: ......
Страница 143: ......
Страница 144: ......
Страница 145: ......
Страница 146: ......
Страница 147: ......
Страница 148: ......
Страница 149: ......
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 165: ......
Страница 166: ......
Страница 167: ......