17.1.2 Setting DIP Switch ................................................................................................................... 319
17.2 Setting Drive Unit MDS-EM/EMH Series ......................................................................................... 320
17.2.1 Setting the Rotary Switch......................................................................................................... 320
17.3 Setting Drive Unit MDS-EJ/EJH Series............................................................................................ 321
17.3.1 Setting the Rotary Switch......................................................................................................... 321
17.3.2 Setting the DIP Switch ............................................................................................................. 322
17.4 Setting Up without Connecting to the Motor/Drive Units at the Startup of Drive Unit ...................... 323
17.5 Connecting the Batteries.................................................................................................................. 324
17.5.1 Control Unit Battery.................................................................................................................. 324
17.5.2 Servo Drive Unit Battery .......................................................................................................... 326
17.6 Connecting and Setting the Remote I/O Unit................................................................................... 329
17.6.1 Outline of the Remote I/O Unit................................................................................................. 329
17.6.2 Connection and Station No. Setting on Remote I/O Unit ......................................................... 331
17.6.3 Station No. Setting when Using Multiple Remote I/O Units ..................................................... 334
17.6.4 PLC Device Assignment of Digital Signal (DI/DO)................................................................... 337
17.6.4.1 Fixed Device Assignment ................................................................................................ 338
17.6.4.2 Arbitrary Device Assignment ........................................................................................... 339
17.6.5 Thermistor Input Interface........................................................................................................ 343
17.7 Initializing the NC Internal Data (SRAM).......................................................................................... 344
18 Setting Up with M80/M800S SETUP INSTALLER ................................................................................ 347
18.1 Activate M80/M800S SETUP INSTALLER ...................................................................................... 349
18.2 Install Custom Screen...................................................................................................................... 351
18.3 Install Start-up Screen ..................................................................................................................... 352
18.4 Install APLC C Language Module.................................................................................................... 353
18.5 Install User Cycle ............................................................................................................................. 354
19 Setting the Parameters and Date/Time ................................................................................................ 355
19.1 Selecting the NC System Type and Displayed Language ............................................................... 356
19.2 Setting the Parameters for the System Specifications..................................................................... 357
19.3 Setting the Parameters for the Machine Specifications ................................................................... 358
19.4 Setting Date and Time ..................................................................................................................... 360
20 PLC Program Writing............................................................................................................................. 361
20.1 Writing PLC Program using the SD Card......................................................................................... 362
20.2 Setting the Ethernet Communication ............................................................................................... 362
20.2.1 Confirming the IP Address for CNC ......................................................................................... 362
20.2.2 Setting the IP Address for PC Side.......................................................................................... 362
20.3 Connecting the Control Unit and a Personal Computer................................................................... 364
20.4 Setting the Communication with GX Developer............................................................................... 365
20.5 Setting the Parameters on GX Developer........................................................................................ 366
20.5.1 Parameter Setting Screen........................................................................................................ 366
20.5.2 Setting the Number of Device Points ....................................................................................... 367
20.5.3 Setting the Number of Common Pointer Points ....................................................................... 368
20.5.4 Setting the Program Execution Order ...................................................................................... 369
20.6 Writing a PLC Program with GX Developer ..................................................................................... 370
20.7 Writing a PLC Program to ROM with GX Developer........................................................................ 371
20.8 Setting the PLC Parameters ............................................................................................................ 372
21 Confirming the Basic Operation ........................................................................................................... 373
21.1 Checking Inputs/Outputs and Alarms .............................................................................................. 374
21.2 Confirming Manual Operation .......................................................................................................... 375
21.2.1 Using the Manual Pulse Generator.......................................................................................... 375
21.2.2 Using JOG Feed ...................................................................................................................... 375
21.3 Servo Simplified Adjustment ............................................................................................................ 376
21.3.1 First Measure Against Vibration............................................................................................... 376
21.3.2 NC Analyzer2........................................................................................................................... 377
22 Setting the Position Detection System ................................................................................................ 379
22.1 Adjusting the Absolute Position Detection System .......................................................................... 380
Содержание M80 series
Страница 1: ......
Страница 4: ......
Страница 9: ......
Страница 21: ......
Страница 23: ......
Страница 25: ......
Страница 27: ......
Страница 29: ......
Страница 37: ......
Страница 38: ...1 IB 1501269 F 1 System Basic Configuration...
Страница 40: ...3 IB 1501269 F 2 General Connection Diagram...
Страница 44: ...7 IB 1501269 F 3 List of Configuration...
Страница 53: ...M800S M80 Series Connection and Setup Manual 3 List of Configuration 16 IB 1501269 F...
Страница 54: ...17 IB 1501269 F 4 General Specifications...
Страница 185: ...M800S M80 Series Connection and Setup Manual 4 General Specifications 148 IB 1501269 F...
Страница 186: ...149 IB 1501269 F 5 Installation...
Страница 211: ...M800S M80 Series Connection and Setup Manual 5 Installation 174 IB 1501269 F...
Страница 212: ...175 IB 1501269 F 6 Precautions for Connecting...
Страница 219: ...M800S M80 Series Connection and Setup Manual 6 Precautions for Connecting 182 IB 1501269 F...
Страница 220: ...183 IB 1501269 F 7 Connection of Control Unit...
Страница 245: ...M800S M80 Series Connection and Setup Manual 7 Connection of Control Unit 208 IB 1501269 F...
Страница 246: ...209 IB 1501269 F 8 Connection of Keyboard Unit...
Страница 248: ...211 IB 1501269 F 9 Connection of Operation Panel I O Unit...
Страница 262: ...225 IB 1501269 F 10 Connection of Remote I O Unit...
Страница 289: ...M800S M80 Series Connection and Setup Manual 10 Connection of Remote I O Unit 252 IB 1501269 F...
Страница 290: ...253 IB 1501269 F 11 Connection of Manual Pulse Generator...
Страница 294: ...257 IB 1501269 F 12 Connection of Synchronous Feed Encoder...
Страница 296: ...259 IB 1501269 F 13 Connection of MITSUBISHI CNC Machine Operation Panel...
Страница 307: ...M800S M80 Series Connection and Setup Manual 13 Connection of MITSUBISHI CNC Machine Operation Panel 270 IB 1501269 F...
Страница 308: ...271 IB 1501269 F 14 Connection of Handy Terminal...
Страница 310: ...273 IB 1501269 F 15 Cable...
Страница 349: ...M800S M80 Series Connection and Setup Manual 15 Cable 312 IB 1501269 F...
Страница 350: ...313 IB 1501269 F 16 Setup Outline...
Страница 354: ...317 IB 1501269 F 17 Setting the Hardware...
Страница 383: ...M800S M80 Series Connection and Setup Manual 17 Setting the Hardware 346 IB 1501269 F...
Страница 384: ...347 IB 1501269 F 18 Setting Up with M80 M800S SETUP INSTALLER...
Страница 392: ...355 IB 1501269 F 19 Setting the Parameters and Date Time...
Страница 398: ...361 IB 1501269 F 20 PLC Program Writing...
Страница 410: ...373 IB 1501269 F 21 Confirming the Basic Operation...
Страница 415: ...M800S M80 Series Connection and Setup Manual 21 Confirming the Basic Operation 378 IB 1501269 F...
Страница 416: ...379 IB 1501269 F 22 Setting the Position Detection System...
Страница 439: ...M800S M80 Series Connection and Setup Manual 22 Setting the Position Detection System 402 IB 1501269 F...
Страница 440: ...403 IB 1501269 F 23 Setting the Tool Entry Prohibited Range...
Страница 453: ...M800S M80 Series Connection and Setup Manual 23 Setting the Tool Entry Prohibited Range 416 IB 1501269 F...
Страница 454: ...417 IB 1501269 F 24 Confirming the Spindle Operation...
Страница 457: ...M800S M80 Series Connection and Setup Manual 24 Confirming the Spindle Operation 420 IB 1501269 F...
Страница 458: ...421 IB 1501269 F 25 Setting the Handy Terminal...
Страница 464: ...427 IB 1501269 F 26 Setting the Deceleration Check...
Страница 474: ...437 IB 1501269 F 27 Adjust S analog Screen...
Страница 479: ...M800S M80 Series Connection and Setup Manual 27 Adjust S analog Screen 442 IB 1501269 F...
Страница 480: ...443 IB 1501269 F 28 Device Open Parameter Screen...
Страница 486: ...449 IB 1501269 F 29 SRAM Open Parameter Screen...
Страница 492: ...455 IB 1501269 F 30 Data Backup and Restoration...
Страница 498: ...461 IB 1501269 F 31 Appx 1 Setting the System Lock...
Страница 502: ...465 IB 1501269 F 32 Appx 2 Protection Setting...
Страница 510: ...473 IB 1501269 F 33 Appx 3 Displaying Original Logo On Standard Screen...
Страница 512: ...475 IB 1501269 F 34 Appx 4 EMC Installation Guidelines...
Страница 523: ...M800S M80 Series Connection and Setup Manual 34 Appx 4 EMC Installation Guidelines 486 IB 1501269 F...
Страница 524: ...487 IB 1501269 F 35 Appx 5 Restrictions for Lithium Batteries...
Страница 531: ...M800S M80 Series Connection and Setup Manual 35 Appx 5 Restrictions for Lithium Batteries 494 IB 1501269 F...
Страница 532: ...495 IB 1501269 F 36 Appx 6 Precautions for Compliance to UL c UL Standards...
Страница 538: ......
Страница 542: ......