–100–
[2] BC Controller Disassembly Procedure
(1)
Service panel
Be careful when removing heavy parts.
Procedure
Illustrations
1. Remove the two screws securing the electric panel
box.
Loosen the two screws securing the electric panel
box, and then remove the box.
2. Remove the four screws securing the front panel
and then remove the panel.
3. Remove the nine screws securing the ceiling panel
and then remove the panal.
(2)
Control Box
Removing the two screws that secures the electric
panel box cover provides access to the controller
board and all of the relay board for checking, so it
is not necessary to perform the task #2 above.
Procedure
Photos
Be careful when removing heavy parts.
Front panel
Ceiling panel
Loosen only
Erectric panel box
Содержание City Multi P500YEM-A
Страница 14: ...13 CNFAN CNPOW CNFC2 CN15V1 CNDR1 CNIPM1 CNE CNDC1 FANCON board G A board...
Страница 15: ...14 Y C board SNB board...
Страница 16: ...15 BC controller CNTR CN02 M NET transmission CN03 CN12 Power supply 1 EARTH 3 N 5 L SW4 SW2 SW1 SW5...
Страница 17: ...16 RELAY 10 board RELAY 4 board...
Страница 70: ...69 1 3 2 4 CV5b CV7b SV7 SV8 Solenoid Valves Block 2 CV4b CV6b CV2b ST1 BV1 BV2 CV3b 1 2 3 4...
Страница 72: ...71 Check Valves Block2 1 3 5 7 6 4 2 CV5b CV4b CV6b CV2b ST1 BV1 BV2 CV3b Check Valves Block2 1 3 7 2 4 5 6...