![Mitsubishi 6M60-TL Скачать руководство пользователя страница 78](http://html1.mh-extra.com/html/mitsubishi/6m60-tl/6m60-tl_service-manual_1809096078.webp)
11-42
Inspection: Piston projection from crankcase top surface
CAUTION
• The amount of piston projection affects engine perfor-
mance and must therefore be inspected without fail.
•
Set the piston at the top dead center.
•
Mark reference points A (seven points in total) on the top surface
of the crankcase as shown in the illustration. Using each of the
marks as a zero point, measure the amount of piston projection
relative to the zero point (height of measurement point B –
height of reference point A).
•
Make the measurements at the two measurement points B for
each cylinder (twelve points in total) using the reference point A
nearest to each measurement point, and calculate the average
value of all the measurements.
•
If the average value is out of the standard value range, check the
clearances between all relevant parts.
Inspection: Connecting rod end play
•
Measure the end play for every connecting rod.
•
If any measurement exceeds the specified limit, replace the de-
fective part(s).
Inspection: Cylinder liner flange projection
•
If the measurement deviates from the standard value, inspect
the installation and replace the defective part(s).
CAUTION
• If the cylinder liner flange protrusion is less than the speci-
fied value, the contact pressure of the cylinder head gasket
against the bore of the cylinder will not be high enough to
prevent gas leakage.
Inspection procedure
Inspection: Connecting rod bearing span when free
CAUTION
• Do not attempt to manually expand the bearings.
•
If the span is less than the specified limit, replace both the upper
and lower bearings.
PISTON AND CONNECTING ROD, CYLINDER LINER
Содержание 6M60-TL
Страница 1: ...Service Manual 99709 51100 For use with the FD80N FD160N Service Manuals 6M60 TL Diesel Engine ...
Страница 2: ......
Страница 8: ...00 00 5 ...
Страница 26: ...00 00 23 212340 OutputUnit V OutputUnit OutputUnit ...
Страница 27: ...00 24 3 2 2 VCM 3OP input monitor and output monitor VCM 3 VCM 3OP 212341 ...
Страница 28: ...00 00 25 3 2 3 MP input monitor VCM 3 MP 212342 ...
Страница 45: ...M E M O 11 9 11 ...
Страница 51: ...M E M O 11 15 11 ...
Страница 52: ...11 16 ROCKER COVER ROCKER BRACKET AND CAMSHAFT ...
Страница 60: ...11 24 CYLINDER HEAD AND VALVE MECHANISM ...
Страница 67: ...M E M O 11 31 11 ...
Страница 83: ...M E M O 11 47 11 ...
Страница 89: ...M E M O 11 53 11 ...
Страница 97: ...M E M O 11 61 11 ...
Страница 103: ...M E M O 11 67 11 ...
Страница 104: ...11 68 CRANKSHAFT AND CRANKCASE ...
Страница 142: ...M E M O 13A 9 13A ...
Страница 152: ...M E M O 13A 19 13A ...
Страница 161: ...M E M O 13E 3 13E ...
Страница 164: ...13E 6 1 1 Supply pump STRUCTURE AND OPERATION ...
Страница 176: ...13E 18 3 Electronic Control Unit Connection Diagram STRUCTURE AND OPERATION ...
Страница 177: ...13E 13E 19 ...
Страница 212: ...14 14 3 1 Cooling System Flow of Coolant STRUCTURE AND OPERATION ...
Страница 220: ...M E M O 14 11 14 ...
Страница 236: ...M E M O 14 27 14 ...
Страница 255: ...M E M O 15 13 15 ...
Страница 272: ...54 54 3 1 Starter This starter uses planetary gears as its reduction gearing mech anism STRUCTURE AND OPERATION ...
Страница 273: ...54 4 2 Alternator 24V 50A STRUCTURE AND OPERATION ...
Страница 276: ...54 54 7 3 Circuit diagram ...
Страница 308: ...M E M O 61 3 61 ...
Страница 309: ...61 4 1 Air Compressor STRUCTURE AND OPERATION ...
Страница 318: ...M E M O 61 13 61 ...
Страница 319: ...61 14 AIR COMPRESSOR 154 cm3 154 mL ...
Страница 322: ...M E M O 61 17 61 ...
Страница 323: ...61 18 AIR COMPRESSOR 319 cm3 319 mL ...
Страница 326: ...M E M O 61 21 61 ...
Страница 327: ...61 22 AIR DRYER ...