– 40 –
■
Setting a default schedule
1.
Press the SCHEDULE SETTING button on the MENU screen.
page 10
2.
Press the DEFAULT SCHEDULE SETTING button on the SCHEDULE SETTING screen.
3
5
6
4
3.
Press the group name.
Select the group on the Select Group screen.
page 41
4.
Set the day schedule to WEEKDAY, HOLIDAY, SPECIAL 1, SPECIAL 2, or NO
OPERATION.
5.
Set the date schedule if necessary.
6.
Press the SET button. Press the Yes button on the con
fi
rmation screen.
When you do not want to set, press the No button.
Note
Pressing the COPY button brings up the Copy Schedule screen when copying between groups.
page 42