![Mitsubishi Electric PVFY-P12 NAMU-E Скачать руководство пользователя страница 43](http://html.mh-extra.com/html/mitsubishi-electric/pvfy-p12-namu-e/pvfy-p12-namu-e_service-manual_238305043.webp)
41
Specifications are subject to change without notice.
© 2017 Mitsubishi Electric US, Inc.
3. Coil Assembly (thermistor, drainpan, heat exchanger)
Exercise caution when removing heavy parts.
1. Remove the Electrical, Blower and
Filter panel indicated in sections
1 and 2.
2. Remove the Coil panel by
removing all of the screws
securing it to the (3) smaller
panels for refrigerant and drain
lines.
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
4
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
1:5
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
DETAIL A
DETAIL B
OUTSIDE COIL SCREWS
Fig. 5
3. Slide the smaller panels in the
directions indicated and remove.
Fig. 6
4. Remove the (1 or 2) brackets that
secure the coil, unplug the
thermistors and LEV from the
control board and route the wires
out of the control box area and
into the coil section. Next, slide
the coil from the frame.
Fig. 7
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
12
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
Fig. 8
Содержание PVFY-P12 NAMU-E
Страница 2: ......