145
12. Removing the reactors (ACL1, ACL2, ACL3)
(1) Remove the service panel. (See Photo 1)
(2) Remove the 4 fixing screws the reactor box. (2/front,
2/back of reactor).
(3) Disconnect the lead wires from the reactor. (See Photo 17)
(4) Remove each 4 fixing screws (2/front, 2/back of reactor) of
3 reactors.
Note 1: The reactor is very heavy (4 kg) !
Be careful when handling it.
Note 2: The reactor box is also removable.
Photo 16
Reactors
Photo 17
Reactors
Lead wires of reactors
Reactors
Figure 2
Reactor box fixing screw (front)
Reactor fixing screws (front)
Reactor box fixing screw (front)
OPERATING PROCEDURE
PHOTOS & ILLUSTRATIONS
OCH527C