- 59 -
3. Step-by-Step Plan for the Implementation of the Air-Conditioning
Basic
Conditions
Securing
Necessary
Rooms
Decision to Install
the Air-Conditioning
System
Selecting the Air-
Conditioner Model
Selecting the
Controllers
Total System
Air-conditioning operation panel (secure individual operation circuit),
Auto Controller (temperature and humidity indicator/recorder),
management, safety, laws, maintenance, earthquake proof,
anti-vibration (floor load, anti-vibration device), noise control, etc.
Calculating
the Load
Setting the Conditions
for the Room
Temperature/humidity Condition
Purpose
Making decisions on the computer system
Accommodates possible future expansion (ensuring the acquisition route)
Operation schedule
Back-up system (in case of breakdowns, power outage, water-supply cut offs etc.)
Air conditioning methods (continuous, floor-duct type etc.)
Computer room, CVCF room, MT Disk Storage room
Supplementary computer room, system surveillance room
Programmer room, operator room
Battery room, transformer room
Содержание PQHY-P250YHM-A
Страница 1: ...DATA BOOK PUHY P250YJM A BS PUHY P500YSJM A BS PQHY P250YHM A PFD P250VM E PFD P500VM E MODEL ...
Страница 75: ......
Страница 78: ......