OPERATING PROCEDURE
PHOTOS
5. Removing the expansion valve
(1) Remove the service panel (Photo 1).
(2) Remove the top panel, the cabinet, and the back
panel (Photo 1, 2, 3).
(Gas recovery is not required if the unit is pumped
down.)
(3) Remove the electrical parts for removing LEV R (Photo 4,
8).
(4) Remove the LEV coils.
(5) Detach the brazed parts of expansion valves and
pipes.
Photo 11
Photo 12
72
HEAD OFFICE: TOKYO BUILDING, 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN
© Copyright 2018 MITSUBISHI ELECTRIC CORPORATION
Issued: Mar. 2021. No.OBH828 REVISED EDITION-B
Issued: Feb. 2021. No.OBH828 REVISED EDITION-A
Published: Dec. 2018. No.OBH828
Made in Japan
Specifications are subject to change without notice.
Expansion
valves
LEV coils
Defrost thermistor (RT61)
Ambient
temperature
thermistor
(RT65)
Outdoor heat
exchanger
temperature
thermistor (RT68)
4-way valve
R.V. coil
Brazed parts
Содержание MXZ-2HA40VF-E1
Страница 18: ...18 OUTLINES AND DIMENSIONS 6 MXZ 2HA40VF MXZ 2HA50VF Unit mm inch OBH828B ...
Страница 22: ...22 MXZ 3HA50VF E1 ER1 E2 OBH828B ...
Страница 23: ...23 MXZ 3HA50VF ET1 OBH828B ...