41
F Check of compressor start failure
D Check of compressor winding
E Check of compressor operation time
●
Disconnect the connector between the compressor and intelligent power module, and measure the resistance between the
compressor terminals.
<<Measurement point>>
At 3 points
BLK-WHT
BLK-RED
WHT-RED
<<Judgement>>
Refer to 11-4.
0 [
Ω
] ················Abnormal [short]
Infinite [
Ω
] ·······Abnormal [open]
NOTE
: Be sure to zero the ohmmeter before measurement.
Measure the resistance between the lead wires at 3 points.
After the compressor is heated with a drier,
does the compressor start? 1
Replace the compressor.
Compressor start failure. Activate pre-heat control.
(Refer to 10-2. "PRE-HEAT CONTROL SETTING")
No
Yes
Does the compressor run for 10 seconds or
more after it starts?
Check the refrigerant circuit.
Check the stop valve.
Yes
No
1
Heat the compressor with
a drier for about 20 minutes.
Do not recover refrigerant
gas while heating.
Heating part
●
Connect the compressor and activate the inverter. Then measure
the time until the inverter stops due to overcurrent.
<<Operation method>>
Start heating or cooling operation by pressing EMERGENCY
OPERATION switch on the indoor unit. (TEST RUN OPERATION:
Refer to 8-3.)
<<Measurement>>
Measure the time from the start of compressor to the stop of
compressor due to overcurrent.
Compressor starts
Abnormal
(IC700 failure)
(Compressor winding short)
Abnormal
(Compressor lock out)
(Starting defect)
Abnormal
(Poor contact,)
(Inverter P.C. board defect)
(Disconnected connector)
Abnormal
(Refrigerant circuit defect)
(Closed valve)
Normal
0 second
1 second
2 seconds
10 seconds
10 minutes
<<Judgement>>
Confi rm that ~ is normal.
•Electrical circuit check
. Contact of the compressor connector
. Output voltage of inverter P.C. board and balance of them (See 11-5. )
. Direct current voltage between DB61(+) and (-) on the inverter P.C. board
. Voltage between outdoor terminal block S1-S2
OBH590G
Содержание MUZ-EF25VE
Страница 11: ...11 MUZ EF25VE E5 ER5 ET5 MUZ EF35VE E5 ER5 ET5 MUZ EF25VEH E1 MUZ EF35VEH E1 OBH590G ...
Страница 12: ...12 MUZ EF25VEH E4 MUZ EF35VEH E4 MUZ EF25VEH E2 E3 ER2 ER3 ET2 ET3 MUZ EF35VEH E2 E3 ER2 ER3 ET2 ET3 OBH590G ...
Страница 13: ...13 MUZ EF42VE E1 MUZ EF50VE E1 MUZ EF42VE E2 E3 E4 ER3 ER4 ET3 ET4 MUZ EF50VE E2 ER2 ET2 OBH590G ...
Страница 14: ...14 MUZ EF42VE E5 ER5 ET5 MUZ EF50VE E3 ER3 ET3 OBH590G ...
Страница 57: ...57 OBH590G ...