40
11-5. TROUBLESHOOTING FLOW
Are the voltages balanced?
Disconnect the connector between
compressor and the intelligent power module
(IC700).
Replace the inverter P.C. board.
Check the voltage between terminals.
Check the compressor.
See 11-5. “Check of compressor”.
No
Yes
See 11-5. “Check of open phase”.
A How to check inverter/compressor
Refer to 11-5. “Check of compressor
operation time”.
Does the compressor operate continuously?
Refer to 11-5. “Check of compressor start failure”.
OK
No
Yes
Refer to 11-5. “Check of compressor
winding”.
Is the compressor normal?
Replace the compressor.
No
Yes
B Check of open phase
C Check of compressor
●
With the connector between the compressor and the intelligent power module disconnected, activate the inverter and check if
the inverter is normal by measuring
the voltage balance
between the terminals.
Output voltage is 50 - 130 V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION: Refer to 8-3.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE
: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board fl ashes 9 times. (Refer to 11-6.1.)
Measure AC voltage between the lead wires at 3 points.
OBH590G
Содержание MUZ-EF25VE
Страница 11: ...11 MUZ EF25VE E5 ER5 ET5 MUZ EF35VE E5 ER5 ET5 MUZ EF25VEH E1 MUZ EF35VEH E1 OBH590G ...
Страница 12: ...12 MUZ EF25VEH E4 MUZ EF35VEH E4 MUZ EF25VEH E2 E3 ER2 ER3 ET2 ET3 MUZ EF35VEH E2 E3 ER2 ER3 ET2 ET3 OBH590G ...
Страница 13: ...13 MUZ EF42VE E1 MUZ EF50VE E1 MUZ EF42VE E2 E3 E4 ER3 ER4 ET3 ET4 MUZ EF50VE E2 ER2 ET2 OBH590G ...
Страница 14: ...14 MUZ EF42VE E5 ER5 ET5 MUZ EF50VE E3 ER3 ET3 OBH590G ...
Страница 57: ...57 OBH590G ...