www.dadehpardazan.ir 88594014-15
12 - 4
12. OPTIONS AND AUXILIARY EQUIPMENT
<Entry example>
Timing
1)
2)
3)
4)
5)
6)
7)
8)
First axis
E1
E2
E3
E4
E1
E2
E3
E4
Second axis
E1
E2
E3
E4
E1
E2
E3
E4
Third axis
E1
E2
E3
E4
E5
E6
E7
E8
Fourth axis
E4
E4
E1
E2
E3
E4
E4
E4
Fifth axis
E4
E4
E4
E4
E4
E1
E2
E3
Sixth axis
E1
E2
E2
E3
E4
E4
E1
E2
Seventh axis
E1
E2
E2
E3
E4
E4
E1
E2
Eighth axis
E1
E2
E2
E3
E4
E4
E1
E2
Total
E 1)
E 2)
E 3)
E 4)
E 5)
E 6)
E 7)
E 8)
Regenerative ES
ES 3)
ES 4)
|ES|-EC
ER
ER
PR(W)
ER/t
f
Calculate the total of energies at each timing. Only when the total is negative (timings 3), 4) in
the example), use the following expression for calculation.
Energy total ER regenerative energy ES (absolute value) C charging total (EC)
If the subtraction results are negative at all timings, the regenerative brake option is not
needed. From the total of ER's whose subtraction results are positive and a single-cycle period,
the power consumption of the regenerative brake option can be calculated with the following
expression.
Power consumption PR [W] (total of positive ER's)/1-cycle operation period (t
f
)
Содержание MELSERVO-J2M series
Страница 26: ...www dadehpardazan ir 88594014 15 1 10 1 FUNCTIONS AND CONFIGURATION MEMO ...
Страница 36: ...www dadehpardazan ir 88594014 15 2 10 2 INSTALLATION AND START UP MEMO ...
Страница 64: ...www dadehpardazan ir 88594014 15 3 28 3 SIGNALS AND WIRING MEMO ...
Страница 74: ...www dadehpardazan ir 88594014 15 4 10 4 OPERATION AND DISPLAY MEMO ...
Страница 112: ...www dadehpardazan ir 88594014 15 6 12 6 GENERAL GAIN ADJUSTMENT MEMO ...
Страница 122: ...www dadehpardazan ir 88594014 15 7 10 7 SPECIAL ADJUSTMENT FUNCTIONS MEMO ...
Страница 124: ...www dadehpardazan ir 88594014 15 8 2 8 INSPECTION MEMO ...
Страница 186: ...www dadehpardazan ir 88594014 15 12 36 12 OPTIONS AND AUXILIARY EQUIPMENT MEMO ...
Страница 190: ...www dadehpardazan ir 88594014 15 13 4 13 ABSOLUTE POSITION DETECTION SYSTEM MEMO ...