3 - 10
MELSEC-Q
3 SPECIFICATIONS AND FUNCTIONS
Common functions
The outline of the functions executed as necessary are described below.
(Refer to Section 2 for details on each function.)
Common functions
Details
Reference
section
Parameter initialization function
This function returns the "parameters" stored in the QD75
buffer memory and flash ROM to the default values.
The following two methods can be used.
1) Method using PLC program
2) Method using GX Configurator-QP
13.2
Execution data backup function
This functions stores the "setting data", currently being
executed, into the flash ROM.
1) Method using PLC program
2) Method using GX Configurator-QP
13.3
External I/O signal logic switching function
This function switches I/O signal logic according to externally
connected devices.
This function enables the use of the system that does not use b
(N.C.)-contact signals, such as Upper/lower limit signal, by
setting parameters to positive logic.
13.4
External I/O signal monitor function
This function monitors the external I/O signal monitor
information in the module's detailed information which can be
displayed on the system monitor of GX Developer 1.
13.5
1: Usable on GX Developer (SW6D5C-GPPW-E or later).
Содержание MELSEC-Q QD75M
Страница 1: ...MELSEC Q QD75M Positioning Module User s Manual Details QD75M1 QD75M2 QD75M4 ...
Страница 17: ...MEMO ...
Страница 64: ...3 11 MELSEC Q 3 SPECIFICATIONS AND FUNCTIONS MEMO ...
Страница 91: ...4 16 MELSEC Q 4 INSTALLATION WIRING AND MAINTENANCE OF THE PRODUCT MEMO ...
Страница 108: ...5 17 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Страница 112: ...5 21 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Страница 116: ...5 25 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Страница 138: ...5 47 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Страница 182: ...5 91 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Страница 188: ...5 97 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Страница 194: ...5 103 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Страница 253: ...5 162 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Страница 274: ...6 21 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 275: ...6 22 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 276: ...6 23 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 277: ...6 24 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 278: ...6 25 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 279: ...6 26 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 280: ...6 27 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 281: ...6 28 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 282: ...6 29 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 283: ...6 30 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 284: ...6 31 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 285: ...6 32 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 286: ...6 33 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 287: ...6 34 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 288: ...6 35 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 289: ...6 36 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 290: ...6 37 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 291: ...6 38 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 292: ...6 39 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 293: ...6 40 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 294: ...6 41 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 295: ...6 42 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 296: ...6 43 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 297: ...6 44 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 298: ...6 45 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 299: ...6 46 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 300: ...6 47 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 301: ...6 48 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 302: ...6 49 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 303: ...6 50 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 304: ...6 51 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 305: ...6 52 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Страница 332: ...7 7 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS MEMO ...
Страница 336: ...7 11 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS MEMO ...
Страница 347: ...MEMO ...
Страница 477: ...9 116 MELSEC Q 9 MAJOR POSITIONING CONTROL MEMO ...
Страница 539: ...11 36 MELSEC Q 11 MANUAL CONTROL MEMO ...
Страница 663: ...14 18 MELSEC Q 14 DEDICATED INSTRUCTIONS MEMO ...
Страница 771: ...Appendix 2 MELSEC Q APPENDICES MEMO ...
Страница 845: ...Appendix 76 MELSEC Q APPENDICES MEMO ...
Страница 855: ...Index 10 X X0 QD75 READY 3 15 X1 Synchronization flag 3 15 Z Zero speed Pr 130 5 74 ...