12
PRE-OPERATION INSTRUCTIONS
1.4 Installation and removal
For safety, turn OFF the inverter when installing or removing the operation panel.
1.4.1
Installing the operation panel on the inverter
• Installation
(1) Remove the operation panel (FR-DU08(-01)) from the inverter. (For the removal of the operation panel, refer to the
Instruction Manual of the inverter.)
(2) Align the connector of the FR-LU08(-01) with the PU connector of the inverter, and insert the operation panel. After
confirming that the operation panel is fit securely, tighten the screws. For the FR-LU08-01, tighten the screws in a diagonal
order. (Tightening torque: 0.40 to 0.45 N
m for the FR-LU08, 0.39 to 0.49 N
m for the FR-LU08-01)
FR-LU08
FR-LU08
FR-LU08-01
FR-LU08-01
Fasten
Fasten
Fasten
Fasten
Содержание FR-LU08
Страница 50: ...50 MEMO IB NA 0600539ENG F ...