1
2
CN108
CN01
(BK)
1
3
CN3C
(BU)
1
3
CNPWM
(WH)
1
8
CN851
(BK)
1
5
CNRF
(WH)
1
5
CN105
(RD)
1
5
CNIT
(BU)
1
2
CN20
(RD)
1
3
CN21
(YE)
1
4
CNW12
(RD)
CNW5
(BU)
1
4
CN1A
(WH)
TBI.1
LED1
LED2
LED3
LED4
TAB1
1
8
1
8
1
8
1
8
1
6
SW1
SW2
SW3
SW4
SW5
F1
F2
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1
3
1
7
1
3
1
3
CNBC
(GY)
CNBH
(WH)
CNBHT
(
BK)
CNIH
(
OG)
CNV1
(WH)
CNP4
(RD)
CNP1
(WH)
TBO.1
TBO.2
TBO.3
.
TBO.4
.
1
5
3
1
5
3
1
3
1
3
3
5
TBI.2
TBI.3
TBI.4
TBI.5
TBI.6
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1
4
1
5
SW6
CN22
(BU)
7.4.2 Connecting inputs/outputs
Signal inputs
Item
Name
Model and specifications
Signal input
function
Signal input
wire
Use sheathed vinyl coated cord or cable.
Max. 30 m
Wire type: CV, CVS or equivalent
Wire size: Stranded wire 0.13 mm² to 0.52 mm²
Solid wire: ø0.4 mm to ø0.8 mm
Switch
Non-voltage “a” contact signals
Remote switch: minimum applicable load 12V DC, 1mA
Wiring specification and local supply parts
Name Terminal block Connector Item
OFF (Open)
ON (Short)
IN1
TBI.1 7-8
—
Room thermostat 1 input *1 Refer to SW2-1 in <7.3.1 DIP Switch Functions>.
IN2
TBI.1 5-6
—
Flow switch 1 input
Refer to SW2-2 in <7.3.1 DIP Switch Functions>.
IN3
TBI.1 3-4
—
Flow switch 2 input (Zone1) Refer to SW3-2 in <7.3.1 DIP Switch Functions>.
IN4
TBI.1 1-2
—
Demand control input
Normal
Heat source OFF/ Boiler operation *3
IN5
TBI.2 7-8
—
Outdoor thermostat input *2 Standard operation
Heater operation/ Boiler operation *3
IN6
TBI.2 5-6
—
Room thermostat 2 input *1 Refer to SW3-1 in <7.3.1 DIP Switch Functions>.
IN7
TBI.2 3-4
—
Flow switch 3 input (Zone2) Refer to SW3-2 in <7.3.1 DIP Switch Functions>.
IN8
TBI.3 7-8
—
Electric energy meter 1
*4
IN9
TBI.3 5-6
—
Electric energy meter 2
IN10 TBI.2 1-2
—
Heat meter
IN11
TBI.3 3-4
—
Smart grid ready input
*5
IN12 TBI.3 1-2
—
INA1 TBI.4 1-3
CN1A
Flow sensor
—
—
*1. Set the ON/OFF cycle time of the room thermostat for 10 minutes or more; otherwise the compressor may be damaged.
*2. If using outdoor thermostat for controlling operation of heaters, the lifetime of the heaters and related parts may be reduced.
*3. To turn on the boiler operation, use the main remote controller to select “Boiler” in “External input setting“ screen in the service menu.
*4. Connectable electric energy meter and heat meter
● Pulse type
Voltage free contact for 12VDC detection by FTC (TBI.2 1pin ,TBI.3 5 and 7 pins have a positive voltage.)
● Pulse duration
Minimum ON time: 40ms
Minimum OFF time: 100ms
●
Possible unit of pulse 0.1 pulse/kWh 1
pulse/kWh 10
pulse/kWh
100 pulse/kWh 1000 pulse/kWh
Those values can be set by the main remote controller. (Refer to the menu tree in "Main remote controller".)
*5. As for the SG ready, refer to "Smart grid ready" in 7.7 System setup.
<Figure 7.4.5>
Note:
Stranded wire should be processed with insulation-covered bar
terminal (DIN46228-4 standard compatible type).
B-214
Water to Water Heat Pump (WTW)
7
Cylinder
unit/
Hydrobox/GSHP/WTW
Содержание EHWT17D-MHEDW
Страница 1: ...DATA BOOK Vol 5 5 R32 ...
Страница 2: ......
Страница 4: ......
Страница 71: ...MEMO ...
Страница 128: ......
Страница 131: ......