DISASSEMBLY PROCEDURE
PHOTOS
57
8. How to remove the plate heat exchanger (continued)
(12) Remove the pump support under by removing the 4
screws. (Photo 8-4)
Note: To avoid dropping of the pump support under,
hold it by hand when removing the last screw.
(13) Remove the 1" nut on the flexible hose end that
connects to the booster heater. (Photo 8-2)
w
When reinstalling the 1" nut, use a new 1" gasket.
(14) Remove the 1" nut on the water outlet side of the
strainer using two spanners: one to hold the strainer
and the other to turn the 1" nut. (Photo 8-2)
(15) Remove the rubber mount by cutting the band.
(Photo 8-2)
(16) Remove the flow switch. (Refer to Procedure 6.)
w
Do not remove the CN2F connector on the controller
board.
w
When reinstalling the flow switch, use a new O-ring.
(17) Remove the flare nuts on the gas and liquid pipes under
the hydrobox using two spanners: one to hold each
flare joint and the other to turn each flare nut.
(18) Remove the plate heat exchanger cover by removing
the 2 screws. (Photo 8-5)
(19) Remove the plate heat exchanger assembly from the
hydrobox. Cut the band and remove the flexible hose
by removing the 1" nut at the top of the plate heat
exchanger. Remove the 1" nut at the bottom of the
plate heat exchanger. (Photos 8-6, 8-7)
w
When reinstalling the 1" nuts, use new 1" gaskets.
Photo 8-4
Pump
support
under
Screw
Screw
Screw
Screw
Photo 8-5
Plate heat exchanger cover
Screws
Photo 8-6
Nut (1")
Flexible hose
Band
Refrigerant piping
Plate heat
exchanger
Photo 8-7
Nut (1")
Refrigerant piping
Nut (1")
Gasket (1")
Содержание EHSC-VM6A
Страница 12: ... See Chapter 6 4 12 6 WIRING DIAGRAM 6 1 EHSC VM6A ...
Страница 13: ... See Chapter 6 4 13 6 2 EHSC YM9A ...
Страница 14: ... See Chapter 6 4 14 6 3 EHPX VM2A ...