44
(5) Copying a schedule
To copy the schedule settings of a day to the schedule settings for
another day of the week, select the day whose schedule settings are
to be copied, click [Copy (Day of the week)], select the day to which
the copied schedule settings are to be pasted, and click [Paste]. The
rectangular icon next to the selected button will appear in yellow-green.
Note: Schedules of a group cannot be copied to a different type of group.
For example, the schedules of an air conditioning unit group cannot be
copied to the schedules for a LOSSNAY unit group.
Note: The operation mode and set temperature may not be copied because
the available operation modes or operable set temperature range differ
among the units.
Copy (Day of the week)/Paste
(6) Saving the schedules
To undo the changes made, click [Undo] before saving the schedules.
After completing the settings, click [Save Settings] to save the schedules.
Save Settings